Olive Ave/Rush Drainage Improvements

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

The City of Novato has completed Olive Avenue Improvements Phase III and Rush Creek Drainage Improvements (CIP Projects No: 97-001 and 00-015).

These projects included the installation of existing aboveground utilities in an underground joint utility trench; improving and widening Olive Avenue including bike lanes and sidewalks and replacing undersized open drainage ditches (on Olive and Railroad).

An Initial Study for the Project was prepared to determine if the construction and operation of the Project would result in significant environmental impacts as required by California Environmental Quality Act (CEQA). The Initial Study did not identify any significant impacts arising from the Project that could not be mitigated to a less-than-significant level. Therefore, the City adopted a Mitigated Negative Declaration for the Project.

Olive Avenue Roadway and Drainage Improvements Project--Initial Study/Proposed Mitigated Neg Declaration DRAFT

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer