Safe Pathways to Schools Sidewalk Gap Closures - Arthur and Plum Streets

Print
Press Enter to show all options, press Tab go to next option

Photo of pedestrain walking on side of road 

Project Overview

Safe Pathways to Schools Sidewalk Gap Closures - Arthur and Plum Streets; (Project # 16-010)

Description

This project includes, but is not limited to: removal and construction of sidewalk, curb & gutter, driveways, driveway approaches, ADA ramps, Type “A” catch basins, installation of prefabricated manhole, 12” HDPE storm drain, curb face drainage outlets, reconfiguration of existing sanitary sewer manholes, removal of existing AC roadway. Miscellaneous items such as construction type “A” barricade, relocation of traffic signs and replacement of pavement striping and markings will also be included.


Location

On designated routes to schools for Novato High School (on Arthur Street between Indian Valley Road and Taft Court) and for the Olive Elementary School (on Plum Street between Chase Street and the back school entrance).  

View project location on an interactive map >>


Benefit

Pedestrian and bicyclist traffic safety.


Schedule

Staff advertised on February 3, 2017 (Bid Opening is Scheduled for February 28, 2017), with construction Starting Spring/Summer 2017.


Cost

$440,000, including $350,000 of Marin County Measure A funds. (Strategy 4.3, Safe Pathways to Schools).


Contact Info

Project Manager
Petr Skala, Assistant Engineer
415.899.8237
pskala@novato.org

Public Works Department
415.899.8246
pw@novato.org

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer