Grant Avenue Bridge Rehabilitation

Print
Press Enter to show all options, press Tab go to next option

photo of Grant ave bridge 

Project Overview

Grant Avenue Bridge Rehabilitation (CIP 09-003)

Description

Widen and rehabilitate the existing bridge to accommodate bike lanes and sidewalks, replace substandard bridge railings, and stabilize the banks and channel of Novato Creek to minimize scouring of bridge foundations.


Location

Grant Avenue between 8th Street and Virginia Avenue.

View project on an interactive map >>


Benefit

Improves streetscape conditions and safety of pedestrians, bicyclists and motorists.


Schedule

Construction work is anticipated to start in 2019/2020, and should last approximately 6 months.


Cost

$2,400,000 including a $2,000,000 federal Highway Bridge Program grant.


Status Update 3/1/18:

Engineering design is now 65% and is anticipated to be finalized in 2018. The right-of-way process is also underway, and utility companies are in the process of relocating their facilities.

Bridge Railing Options: The City is considering three different bridge railing options, shown below. If residents have a preference, they can send an email to pw@novato.org. *Please note that the price for Option C would be twice the amount of options A and B.

Caltrans Standard Railing - Option A
Option A: Caltrans Standard Bridge Railing

Novato Standard Railing - Option B
Option B: Novato Standard Bridge Railing

Custom Wrought Iron - Option C
Option C: Custom Wrought Iron Railing

Contact Info

Project Manager
Gosia Woodfin, Assistant Engineer
415.899.8997
gwoodfin@novato.org

Public Works Department
415.899.8246
pw@novato.org

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer