Status: Withdrawn

On May 9, 2022, the City deemed the application withdrawn because the applicant failed to tender a substantive response to the Director within 60 calendar days after the Director deemed the application incomplete.

Withdrawn Application Status Letter, dated May 9, 2022

The City deemed this application incomplete on March 7, 2022. 

Completeness Letter


Description

This webpage includes small cell wireless application materials that have been submitted to the City of Novato. Application materials and other information regarding the status of the applications are available at the links below. If and when additional application materials are submitted to the City, those documents will be posted on the respective webpages linked below. The webpages will also be updated as necessary regarding application status.

Small cell wireless application are governed by City of Novato Ordinance No. 1654 and are reviewed against the Small Wireless Facility Use Permit Application Checklist.

Original Filing Date

February 25, 2022

Location

 1553 South Novato Blvd

View project location on an interactive map >>

Application Material(s)

Noise Study

Photo Sims (3 Views) & Shot Map

Plan Set & TCP

Planning Application

Project Narrative & Justification

RF Compliance Report

Shot Clock Letter

Structural Analysis


Contact Info

City Contact
Vivek Damodaran, Senior Planner
415.899.8939
vdamodaran@novato.org

 

 

 

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer